BACKYARD REMODEL- B4 AND AFTER
Jan 31- June 28, 2009
Five years after we moved into our remodeled home we had saved enough money to finish the backyard. We started in Winter so we could get the full attention of the pool remodel crew. They were in and out in less than 8 weeks. We changed the size/ shape of the pool, filled in the spa, replaced all of the electrical, most of the plumbing and all of the decking. I spent the next 3 months installing new drainage, drip irrigation, lighting, and “detaining” the yard. This is a Before and After Slideshow.